Know the corridor before you dig.
Pipelines corrode, foundations heave, corridors cross ground nobody surveyed. The cost of learning that after you break ground is the project. Know the soil along the route and under the pad before the shovel.
Pipeline & utility operators
Weighted toward corrosivity, slope and water table: what fails what you build and bury.
Same six measured factors. The weighting changes, the score changes, the customer changes. One database underneath.
Corridor & siting score
The same factor stack, reweighted toward what fails what you build and bury, scored continuously along a corridor or under a pad.
- Corrosivity to steel & concrete
- Slope
- Drainage
- Depth to water table
See it in the live tools.
Your products.
A go / caution / no-go verdict on a site, per parcel, with a written assessment for the executive who signs.
See product →A licensed pedologist's written answer to the question on your desk, defensible to a lender, a regulator, or a jury.
See product →Continuous, exact-survey-line soil surfaces, licensed for integration. The end of the polygon.
See product →