Why Wind Farm Micrositing Needs Soil Science
Wind turbine foundations fail when soils heave or settle, yet most projects skip the public soil data that would predict it. SSURGO drainage class, linear extensibility, and settlement ratings can tell a developer which turbine positions need a million-dollar pile foundation and which need a standard mat, before any borings are drilled.
Read the analysis →